|
Intumescent FR Mortar expands whilst curing to make a very effective seal and once set (off-white) it can be drilled or sawn to allow the passage of other cables, pipes etc. provided these are re-sealed. For large floor openings such as riser ducts which require load-bearing capacity, please consult our Technical Department for a steel reinforcement specification and installation manual.
| Fire Rating / Thickness / Pourable Coverage |
| Fire Rating: |
Depth of Mortar: |
Approx No of 20kg sacks / sq metre: |
| 1 hour |
75 mm |
3.5 (20 kg) Sacks |
| 2 hours |
75 mm |
3.5 (20 kg) Sacks |
| 3 hours |
100 mm |
4.8 (20 kg) Sacks |
| 4 hours |
100 mm |
4.8 (20 kg) Sacks |
|